General Instructions
Please refer to the videos below for instructions on how to build the mould, mix, cast, process and finish your concrete.
Each Cast-In-Place Kit covers the following area at the thickness given;
Thickness (mm)
25
30
35
40
Area (sqm)
0.45
0.375
0.32
0.28
Water Ratio
Each Cast-In-Place Mix requires approx 1.75L of water. This is an approximate guide because the “thirst” for each mix will depend on the ambient conditions. Should the mix be too stiff extra water should be added in 50ml increments, with each increment being thoroughly mixed before adding further water.